• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel
LOGIQ Ultrasound: Whole‑body general imaging

Every patient. Every solution. Every need. They’re all different–every day. You need an ultrasound system that can navigate these challenges with you. A trusted companion. LOGIQ™ ultrasound, the next level.

LOGIQ E10 Ultrasound

Lead the way with ultrasound designed for today and tomorrow. Powered by next-generation cSound™ Architecture for exceptional near and far imaging, advanced imaging tools, AI-driven workflows, and a flexible digital platform, LOGIQ E10 helps boost diagnostic confidence across diverse clinical needs while driving operational excellence.

Confident diagnosis

Diverse full body imaging from head to toe, obese to thin, neonate to geriatric

Comprehensive tools

Gain a new level of confidence in your diagnostic decisions with advanced tools

Concise workflow

Leverage AI and productivity tools to achieve workflow efficiency

Smart investment

Open platform with AI tools, third-party apps, and lifecycle support boosts value

LOGIQ E10s Ultrasound

This system empowers ultrasound departments to meet dynamic challenges with scalable functionality. Its advanced imaging, AI-powered workflows, and flexible digital platform support efficient care across diverse clinical needs—while enabling you to take advantage of growth opportunities.

Confident diagnosis

Diverse full body imaging: head to toe, obese to thin, neonate to geriatric

Comprehensive tools

Access to a growing range of tools gives you flexibility to manage challenges

Concise workflow

Leverage AI and productivity enhancers to achieve clinical efficiency

Smart investment

Robust features to support cost-efficiency, security, and long-term value

LOGIQ Fortis™ Ultrasound

The GE LOGIQ Fortis ultrasound is built to help users deliver on the promise of confident care in multiple clinical settings to move to patients across departments

Exceeding your expectations

Strength and power to enhance clinical capabilities and deliver exceptional image quality

Optimizing your productivity

AI and productivity tools enable new and skilled users to work quickly and manage high-patient volumes

Maximizing your investment

Powerful open platform with lifecycle support from training to security to asset management

LOGIQ Totus™ Ultrasound

This sleek, portable system takes multi-purpose ultrasound to a new level. An AI-powered workflow and decision-support tools drive efficiency and versatility, while its high-quality imaging enhances head-to-toe diagnostic confidence.

Trust your decisions

Exceptional clinical versatility and AI-powered decision support for wide range of patients

Improve your efficiency

AI-powered workflow plus productivity tools help users streamline tasks and improve efficiency

Expand your solutions

Everything you need today, with a scalable open platform

LOGIQ P10 XDclear™ Ultrasound

Make it easy. Make it your own. The LOGIQ P10 XDclear ultrasound system brings you advanced ways to increase everyday efficiency—tools and functions you can customize to your own preferences so exams flow easily, your way.

Personalize workflow

Customizable workflow features deliver high efficiency your way

Patient-centric

Multi-purpose capabilities to perform a wide range of exams

Powerful support

Optimize system uptime and utilization

LOGIQ P9 XDclear Ultrasound

Make it easy. Make it your own. The LOGIQ P9 XDclear ultrasound system brings you advanced ways to increase everyday efficiency—tools and functions you can customize to your own preferences so exams flow easily, your way.

Personalized workflow

Automation and tools offer efficiency to support the way you work

Patient-centric

Robust set of advanced features offer diagnostic flexibility

Powerful support

Industry-leading cybersecurity, data management and educational resources

The LOGIQ Series

Elevated experience

For over three decades, LOGIQ has evolved, adapting to the changing healthcare landscape. LOGIQ stands as a symbol of trust and innovation, redefining ultrasound possibilities, transforming practices and the patient experience. With LOGIQ systems you can expect excellent imaging and streamlined workflow.

Easy imaging

Systems allow you to achieve exceptional spatial and contrast resolution without the need to manually adjust

Efficient workflow

Systems include connectivity, collaboration, and AI-powered solutions to make ultrasound work more effectively for you

Enterprise solutions

Systems offer robust enterprise-ready features to support standardization, security, and long-term value

Intelligently designed to make a difference

The latest LOGIQ Series offers comprehensive tools to help you elevate care, including the new liver leadership package, advanced AI workflow tools and a powerful open platform.*

Liver leadership package

Non-invasive quantitative tools for liver assessment, including our new Ultrasound-Guided Fat Fraction to measure liver fat infiltration and provide a percentage-based steatosis metric that supports better care.
feature-card-full-width-liver-leadership-package-desktop-tablet

AI-powered tools

Our AI-powered workflow productivity tools help to detect and segment anatomies—boosting measurement accuracy, streamlining system interactions, and enhancing clinical efficiency.
feature-card-half-width-ai-powered-assistant-tools

Powerful open platform

Our digital platform enables seamless access to AI tools, third-party applications, and integrated reporting, empowering users to customize workflows and drive better outcomes.
feature-card-half-width-powerful-open-platform

AI-powered precision with Auto Abdominal Suite 2.0

The LOGIQ Series brings next-level efficiency with AI-powered tools that simplify workflow and accelerate exam performance. Built on deep learning and intelligent anatomy recognition, the new Auto Abdominal Suite 2.0* leverages organ segmentation trained on pathology to deliver high measurement accuracy and rapid caliper adjustments—helping you work smarter and faster.
46%

time savings and reduce keystrokes by two-thirds with Auto Abdominal Color Assistant 2.0¹

44%

faster measurement and editing with Auto Abdominal Suite 2.0 + SmartEdit, with 54% fewer keystrokes¹

65%

faster measurements with Auto Abdominal Suite 2.0 + SmartEdit + Scan Assistant, with 80% fewer keystrokes¹

Advancing clarity. Enhancing confidence.

Further your practice with insights from peers and industry innovations.

Hear from clinicians

Hear from clinicians and peers on how they overcome today’s challenges and deliver care across diverse clinical settings with LOGIQ ultrasound.

s-curve-vscan-air-cl-desktop-tablet

Next-level specialty probes

The new XDclear and extended wireless Vscan Airᵀᴹ probes are designed to deliver exceptional image quality and diagnostic precision across a range of applications.

s-curve-probes-desktop-tablet

Cybersecurity

Depend on SonoDefense, our multi-layer approach to cybersecurity and data privacy protection, to protect your system operation and patient data from cyber threats and unauthorized access.

s-curve-cybersecurity-desktop-tablet


References

* Not all products or features are available in all geographies. Check with your local GE HealthCare representative for availability in your country.

cSound, LOGIQ, LOGIQ Fortis, LOGIQ Totus, Vscan Air, XDclear, ViewPoint and Verisound are trademarks of GE HealthCare.

1.Claims based on GE HealthCare LOGIQ ultrasound AI and automation claims evaluation study. Conducted June 2025. DOC3073348.

Have a question? We would love to hear from you.

JB07900XX April 2024
Contact us

We're ready to support you in your moments that matter.

We’re sorry, a problem occurred with the form. Please try again.
Thank you for your inquiry.

We will be in touch soon.

Something went wrong

We will check and get back.