• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel
category-hero-desktop-ba-en

C-arms for Spine Imaging

Experience amazing image quality and large field of view in 2D and 3D during spine procedures with the OEC premium mobile C-arms.

Experience clear and detailed visualization during a variety of spine procedures. OEC C-arms also bring efficiency to any operating suite through a variety of imaging options, including mobile cone beam CT.

Spine imaging features

  

Precise

With OEC 3D, comprehensive imaging coverage of 19 cm x 19 cm x 19 cm 3D volumes and exceptional 2D images enables viewing several levels of the spine in the operating room.

The OEC 3D presents five perspectives: Axial, Coronal, Sagittal, MIP, and VR, on a 4K display for clear and detailed review of 3D volumes and 2D images

s-curve-precise-desktop-ci-en

Relevant

Analyze CT-like images with the OEC 3D Volume Viewer which includes Multi-Oblique, Area Measure, Window Level/Window Width, rotate, zoom, and more for quick and comprehensive visualization.

Enhance 2D imaging with Spine and C-Spine preset profiles. Digitally zoom up to 4X during a fluoro shot with no change in dose by using Live Zoom.

s-curve-relevant-desktop-ci-en

Efficient

Review screws with automatic detection and numbering, manually label spine levels, and visualize spinal curvature alignment with Spine Suite, an optional application available with OEC 3D.

s-curve-efficient-desktop-ci-en
promo-dynamic-oec-3d-spine-imaging-room-desktop-ba-en

Spine imaging you need

Complex spine procedures demand powerful imaging.
OEC premium C-arms excel in:

•  Vertebral Body Tethering
•  Anterior Cervical Discectomy and Fusion
•  Spine Fracture Reduction
•  Vertebroplasty
•  Cervical Disc Replacement
•  Lumbar Fusion
•  Laminectomy
•  Spinal Arthrodesis
Related products

Discover other OEC C-arm products

oec-3d-product-tile-en

OEC 3D

Designed to bring high-definition 3D and 2D images to surgical suites and integrating into existing surgical workflows.
oec-elite-cfd-product-tile-ci-en

OEC Elite CFD

Offers stunning image clarity and detail at low dose with enhancements for an easy and efficient experience.
oec-one-cfd-product-tile-en

OEC One CFD

Compact mobile C-arm delivers a Clear View of anatomy across procedural settings in a synchronized, all-in-one workflow.

Footnotes:

*OEC Open is the OEC 3D C-arm interface designed to transfer 3D reconstructed volume data set to navigation or robotic systems.

Get in touch

Have a question? We would love to hear from you.

Contact us

We're ready to support you in your moments that matter.

We’re sorry, a problem occurred with the form. Please try again.
Thank you for your inquiry.

We will be in touch soon.

Something went wrong

We will check and get back.