• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel

C-arms for Bronchoscopy Imaging

OEC C-arms efficiently provide fluoroscopy images and 3D volumes for bronchoscopy procedures.

pulmonary-and-thoracic-desktop-ba-en
OEC C-arms bring efficiency to any procedure through a variety of imaging options, including mobile cone beam CT. Whether conducting a biopsy or localization, a clear display with large field of view provides detailed visualization of thoracic anatomy.

Bronchoscopy imaging features

      

Precise


The OEC 3D provides comprehensive imaging with precise 19 cm x 19 cm x 19 cm 3D volumes and exceptional 2D images intraoperatively.

The OEC 3D presents five perspectives: Axial, Coronal, Sagittal, MIP, and VR, on a 4K display for clear and detailed review of 3D volumes and 2D images.

precise-s-curve-desktop-st-en

Relevant

Select Lung Preset for optimized view of pulmonary structures. Easily change slices or adjust slice thickness for multiplanar assessment of lesions and bronchial structures.

 

Analyze CT-like images with the OEC 3D Volume Viewer which includes Multi Oblique Mode with reference coordinates, Window Level/Window Width, rotate, zoom, and more for quick and comprehensive tool-in-lesion confirmation.

relevant-s-curve-desktop-ci-en

Efficient

Augmented fluoroscopy aids visualization with ability to select point of interests in the OEC 3D CBCT volume and overlay on live fluoroscopy images. To accommodate patient and equipment positioning, the OEC 3D scan range is also adjustable for a simplified imaging workflow. Features available in Lung Suite application.

job-surgical-st-en
pulmonary-imaging-desktop-st-en

Bronchoscopy imaging you need

Complex bronchoscopy procedures require powerful imaging systems.

OEC premium C-arms perform in a variety of procedures such as:

  • Bronchoscopy
  • Endoscopy
Related products

Discover other OEC C-arm products

oec-3d-product-tile-en

OEC 3D

Designed to bring high-definition 3D and 2D images to surgical suites and integrating into existing surgical workflows.
oec-elite-cfd-product-tile-ci-en

OEC Elite CFD

Offers stunning image clarity and detail at low dose with enhancements for an easy and efficient experience.
oec-one-cfd-product-tile-en

OEC One CFD

Compact mobile C-arm delivers a Clear View of anatomy across procedural settings in a synchronized, all-in-one workflow.

Have a question? We've love to hear from you.

Contact us

We're ready to support you in your moments that matter.

We’re sorry, a problem occurred with the form. Please try again.
Thank you for your inquiry.

We will be in touch soon.

Something went wrong

We will check and get back.