• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel
Upgrade and lift solutions

Maximize the value of your existing X-ray equipment to provide the most effective experience possible for your staff and your patients.

At a glance

Modernize your system

Get the latest features and technology for a fraction of the cost of new

Patient-centered care

Smarter technology so your team can focus on patient care

Minimal downtime

Keep equipment up to date while avoiding disruptions to care

Bringing you smarter ways to X-ray

Whether you’re upgrading or lifting to a new system, our programs are designed to ensure your investment opens up new possibilities for patients and staff, while positioning you for a better future. Because utilization is key, upgrade and lift programs are designed to make the smartest, most impactful use of your current assets while minimizing downtime and reducing your total cost of ownership.
73%

of radiology departments see operational efficiency as the biggest challenge¹

35%

of studies are repeated on a daily basis²

35%

of radiology departments report staff shortages³

Discover our upgrade and lift programs

Card image
Learn more
Card image
Learn more
Card image
Learn more
Card image
Learn more

Collaborating to improve care

By partnering with practitioners, we help solve some of the greatest challenges of X-ray, so every day is easier and more enjoyable for your staff and more meaningful for the patient. With new tools, you can streamline workflows, lessen workloads, make your systems smarter and be better equipped to address a variety of patient needs.

s-curve-programs-1-ph-en

Designed to enable patient-centered care

When you give your team smarter and simpler technology, the reduced workload allows them to focus on what matters most—patient care. Both technologists and radiologists can feel more confident in their work, which can lead to higher job satisfaction and longer retention. And with more advanced capabilities, you can also serve the needs of more patients with less strain on staff.

s-curve-patient-centered-care-2-ph-en

Modernize your system with minimal disruption

Upgrades and lifts are designed to reuse as many original parts as possible and to minimize downtime in order to avoid disruptions to patient care. You can now upgrade your GE HealthCare X-ray systems with the latest features and next-generation technology for a fraction of the price of buying equipment.

s-curve-modernize-3-ph-en

Manage the financial impact

It’s not easy or inexpensive to keep current with imaging technology, but upgrades and lifts can be the most economically smart, sustainable, and efficient way to maximize your X-ray equipment’s lifecycle and value. When you add new capabilities, you are keeping your site up-to-date and competitive while potentially expanding your offerings.

s-curve-financial-impact-4-ph-en

References
  1. Q: “What do you believe the main challenges in your department will be in the next 1-3 years?” N = 1151; GE HealthCare Data and Market Research JB19471XX
  2. Lacson, Ronilda, et al. “Closing the Loop on Unscheduled Diagnostic Imaging Orders: A Systems-Based Approach.” Journal of the American College of Radiology 18, no. 1 (2021): 60–67. https://doi.org/10.1016/j.jacr.2020.09.031.
  3. Panner, Morris. “Minding the Gap: Strategies to Address the Growing Radiology Shortage.” Imaging Technology News, July 13, 2023. https://www.itnonline.com/article/minding-gap-strategies-address-growing-radiology-shortage.

Disclaimers

* FlashPad Plus detectors are not commercially available in all markets. Check with your local GE HealthCare representative for availability in your country.
FlashPad HD detectors offer up to 40% detectability increase, measured with a Contrast Detail phantom study comparing FlashPad and FlashPad HD detectors.
Definium 656 HD is a commercial configuration of Discovery XR656 HD.
AMX 200 is a commercial configuration of Optima XR200amx. AMX 220 is a commercial configuration of Optima XR220amx. AMX 240 is a commercial configuration of Optima XR240amx.

Have a question? We would love to hear from you.

Have a question? We would love to hear from you.

We’re sorry, a problem occurred with the form. Please try again.
Thank you for your inquiry

We will be in touch soon.

Something went wrong

We will check and get back.