• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel
Voluson S8 Signature Series ultrasound system

With its effortless workflow and superior image quality, the Voluson™ Signature Series helps you obtain critical answers with clarity and speed to help streamline imaging procedures. Reduce time spent on image acquisition, analysis, and reporting with this vital device's sleek ergonomic design, built-in automation and sophisticated software tools. Spend more time with your patients and your staff, building trust and practice growth.

 

EXTRAORDINARY IMAGING SIMPLIFIED Providing advanced clinical capabilities for diagnostic assurance Built on the foundational Voluson Core Architecture, the Voluson Signature Series ultrasound system’s power comes from a seamless synergy between probes and platform.

The result is excellent 2D and 3D/4D image quality, quickly, easily – without the need to spend time adjusting the controls.

voluson-s8-signature-series-ge-s-curve-2d-and-3d-4d-image-quality

Effortlessly conduct 3D/4D imaging with RAB6-RS ultralight volume probe that is 40% lighter than the previous version.

voluson-s8-signature-series-ge-s-curve-3d-4d-imaging-with-rab6-rs

Reveal hidden details and enrich clinician-patient communication with HD liveTM technology to expose unprecedented depth, clarity and exceptional anatomical realism.

voluson-s8-signature-series-ge-s-curve-revealhidden-details

Easily view irregularly shaped structures with Advanced Volume Contrast Imaging (VCI) with OmniView – Adjust slice thickness on 3D or 4D images to help enhance contrast resolution then apply OmniView to obtain any plane from a 3D or 4D volume by simply drawing a line, curve, poly-line or trace on anatomy.

voluson-s8-signature-series-ge-s-curve-advanced-volume-contrast-imaging

Take your 3D images further with 3D Printing for rapid clinical prototyping, and parent bonding.

voluson-s10-ge-s-curve-3d-images-further-with-3d-printing

EMPOWERING PERSONALIZED CARE Insights helping lead to better connections

Maximize comfort and workflow through a modern ergonomic design including widescreen 23" monitor – a battery pack offers 20 minutes of scan time and ~15 second wake time from sleep mode.

voluson-s8-signature-series-ge-s-curve-widescreen-23-monitor

Decrease complexity and increase exam consistency with Voluson’s Sono-automation technologies. Semi-automated biometry measurements seamlessly fit into your 2D workflow using SonoBiometry for BPD, HC, AC, FL and HL.

voluson-s8-signature-series-ge-s-curve-voluson-s-sono-automation

Balance schedules while increasing patient satisfaction with Scan Assistant. This flexible, customizable exam protocol tool helps increase exam consistency and productivity while documenting for quality assurance purposes.

voluson-s8-signature-series-ge-s-curve-scan-assistant

Optimize your skills by accessing educational videos directly on the Voluson ultrasound system.

voluson-s8-signature-series-ge-s-curve-educational-videos

Protect sensitive data with Voluson ultrasound systems advanced security features including Whitelisting and HD encryption.

voluson-s10-ge-s-curve-security

Text or email images to patients or colleagues directly from the console, for an instant connection with Tricefy™ inside.

voluson-s10-ge-s-curve-tricefy-inside

Count on responsive service and support from dedicated staff and programs that truly meet your training, equipment maintenance, transducer protection, and flexible financing.

voluson-performance-p8-s-curve-module-responsive-service
FOOTNOTES
© 2019 General Electric Company – All rights reserved.
GE Healthcare reserves the right to make changes in specifications and features shown herein, or discontinue the product described at any time without notice or obligation. Contact your GE Healthcare representative for the most current information. GE, the GE Monogram and Voluson are trademarks of General Electric Company. Tricefy™ trademarks are registered trademarks of Trice Imaging, Inc. GE Healthcare, a division of General Electric Company. GE Medical Systems, Inc., doing business as GE Healthcare.
JB08962XX