Not all products or features are available in all markets.

  • Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel

Vscan Air™ SL with
Caption AI™

Vscan Air SL with Caption Guidance™ software provides real-time guidance that shows you, step-by-step, how to maneuver the probe to capture diagnostic-quality standard echocardiographic views anytime, anywhere*.

At a glance

Prescriptive Guidance

Real-time, turn-by-turn prompts to help you properly position your probe

Quality Meter

The meter rises as the image improves and gets closer to diagnostic-quality

Save Best Clip

Tap save best clip to select the best available image loop for each view

AutoEF

Automatically calculates the LVEF from one or more views

Get more from your Vscan Air experience

   

Prescriptive Guidance

See real-time, turn-by-turn guidance that prompts your movements to properly position your probe for the view you want to capture.

1-tablet-pguidance-s-curve-desktop-ci-en

AutoCapture

For cases where you can reach the quality threshold, AutoCapture will automatically save your clip, hands-free. No need to tap store.

auto-capture-desktop-s-curve-ci-en

Save Best Clip

Tap save best clip to select the best available image loop for each view.

3-tablet-ap2-sbc-s-curve-desktop-ci-en

AutoEF

Automatically calculates the left ventricular ejection fraction from one or more of these three views: PLAX, AP2, and AP4. The calculation increases in accuracy as each view is acquired.

4-phone-caption-ai-r4-autoef-s-curve-desktop-ci-en

FAQs

What is Caption AI™?

What is Caption AI™?

What views can I acquire using Caption Guidance™?

What views can I acquire using Caption Guidance™?

What is AutoEF?

What is AutoEF?

Can I create my own protocols with guidance?

Can I create my own protocols with guidance?

Which display devices can I use with Caption AI?

Which display devices can I use with Caption AI?

References

* The device has been verified for limited use outside of professional healthcare facilities. Use is restricted to environmental properties described in the user manual.
**Not AI-driven. Users should be trained in the use of Color Doppler.

Get in touch

Have a question? We’d love to hear from you.

JB28664XX March 2024