• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel
Ultrasound Guided Regional Anesthesia | Ultrasound System
Whether you are performing needle guided procedures or perioperative care, we support the spectrum of use with vibrant images, and a suite of proven AI tools that simplify complicated asessments.

Venue™

Venue is adaptable, intuitive and easy to clean and is equipped with AI-enabled tools to help simplify the complex, enable fast assessments, support your life-saving decisions and help monitor patient progress even in unpredictable and chaotic environments.

Intuitive 19" LCD Multi touch High-res color screen

Supports early diagnosis and helps you quickly decide on next steps.

Moves With You

Equipped with a swivel arm that’s flexible and rotatable, easily maneuver the system to the bedside or in tight spaces.

Battery Powered

Equipped with long-lasting batteries that provide active scan times of up to 4 hours.

Probes Up Top

Built with four probe ports, easily access probes and keep them in good condition with smart cable management.

Venue Go™

A simple, fast and precise ultrasound for every moment, GE Healthcare’s Venue Go™ point of care ultrasound is designed to simplify the complex.

AI-enabled tools

Our AI-enabled tools utilize proprietary algorithms that synthesize patient data. This enables fast patient assessments and diagnoses with clinical confidence.

Easy to use

Venue Go helps clinicians begin imaging quickly with features such as easy graphical documentation, gesture control, and quick transducer selection.

Battery powered

Equipped with long-lasting batteries that provide active scan times of up to 2 hours.

Cart to table to wall

Built for portability, Venue Go is designed to go from cart to table to wall with ease. Built with a small footprint, its ergonomic design makes it a take-anywhere system.

Venue Fit™

Designed to fit your practice, fit your space and fit your needs, Venue Fit is streamlined yet powerful. A small but efficient point of care ultrasound system with features you have come to know and love from the Venue Family.

Ready to scan

Equipped with two active probe ports and a long-lasting battery providing up to 1 hour of scan time. An easy to see count-down timer changes color when you are running low.

Touch, pinch and swipe

No buttons. No knobs. A familiar 14-inch touch screen with a simple, clear and intuitive interface works even with gloves or screen covers.

Moves with you

A small footprint with large casters easily maneuver the system to the bedside, navigate between equipment and reach tight spaces common in point of care.

Uniquely adaptable

Detachable holders and bins allow you to configure the system cart to fit your needs. Store gel packets and needles in easy reach and connect the larger bin to the front or back- if you need to get closer bedside.

MADE FOR ANAESTHESIA

Infection control

Easy to clean, smooth and seamless surfaces support infection control efforts. Foot pedals easily raise or lower systems, even while seated.

Precise blocks

Needle visualization at deep and shallow depths on even the most challenging body types.

From block to periop

Assess volume status, acquire images, make calculations, streamline patient care and create visual documentation automatically.

Remove the clutter

With Simple Screen, 39% larger image size for Venue™ and 18% larger image size for Venue Go™, Venue Fit™

Remove the clutter | Simple Screen

See a larger ultrasound image and view only the icons you want by activating Simple Screen mode. Simple screen activated on Venue™ increases the image size 39%, on Venue Go™ & Venue Fit™ image size is 18% larger.1
1. Supporting evidence for Venue and Venue Go is documented in DOC2391130. Supporting evidence for Venue Fit is documented in DOC2454794.

Button probes

With our button probes, clinicians can perform procedures while controlling multiple parameters of the system from the probe without breaking the sterile field. Now, needle procedures that once required two people can be done with one.

WebsiteAnaesthesiaThird component the S curveDesktop21300x980
MADE FOR PERIOPERATIVE
Perform patient assessments, while maintaining patient comfort

Confidently perform patient assessments, while maintaining patient comfort. Whether you are adopting FATE or RUSH protocols or assessing volume status-acquire images, make calculations, streamline patient care and create visual documentation automatically.

WORKING SMARTER, NOT HARDER
With AI tools, you can quickly assess the heart, lungs, and inferior vena cava and rapidly access parameters like VTI and IVC collapsibility or distensibility index during perioperative care. Your time is freed up for clinical decision making and action.


- Real-Time EF | Calculates real-time ejection fraction during live scanning in apical 4CH view and allows users to capture instant, precise results.

- Auto IVC | Measure IVC collapsibility or distensibility accurately and automatically.

- Auto VTI | Calculate VTI and CO in one simple step. The VTI Trending function helps clinicians quickly visualize the trend to help determine the next course of action.

- Auto B-lines | Highlights and counts B-lines in real-time and displays the image with the highest B-line count.

Venue_Go_Work_Smarter
EASY & FAST EXAM DOCUMENTATION
Easy documentation features provide a visual overview of the entire exam while reducing the need to manually type findings. Exams are stored as one single image and users can easily switch between exams with one simple click.


- Lung Diagram | Single view diagram of anatomical lung segments with one click image storing, automatically calculates the Lung Ultrasound Score (LUSS)

- eFAST Diagram |
Assess and document patient status – from internal bleeding to pneumothorax

- Renal Diagram | Provides easy follow up for patients with suspected hydronephrosis

VenueEasyFast

Need help making the right choice?

Please let us know by filling out the form

Venue_Systems-compressed
Contact us

We're ready to support you in your moments that matter.

We're sorry, a problem occurred with the form. Please try again.
Thank you!

We received your request for assistance.

A GE Healthcare specialist will be reaching out shortly.

Something went wrong

We will check and get back.

JB00809AU March 2022