• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel

 

Automated spine labeling with oblique and straightened reformat generation to improve ease of reading and reporting.

 

Bone VCAR provides an automated spine labeling application based on a deep learning model. It can identify and label segments of the spine or the entire spine in a matter of seconds.

Bone VCAR

Automated spine labeling with oblique
and straightened reformat generation
to improve ease of reading and reporting

Bone VCAR is a software analysis package utilizing a deep learning technique that assists in the analysis and visualization of CT data.
Bone VCAR assists in identification and review of your spine reconstructions by providing automatic oblique and straightened reformats, completed within seconds and available within all workflows.

AUTOMATED

spine identification and labeling

 

<5 sec* to label

the spine for volumes of 300mm or less

<5 sec* to label

the spine for volumes of 300mm or less

Designed to simplify the reading experience
and improve reporting efficiency:

  • Automated spine labeling
  • Automated generation of a 3D trace to generate oblique and straightened reformat views
  • Automated generation of oblique views perpendicular to vertebral bodies and disc spaces
  • Easily edit the centerline to ensure accurate placement in the most challenging cases
  • Accessible for any exam type: trauma, oncology, dedicated spine, general imaging
  • Load multiple series and vertebrae labeling will propagate to the different volumes
  • Works on full spine acquisitions as well as limited acquisitions containing segments of the spine
S-Curve-470px-Bone-VCAR

FOOTNOTES

*timing specifications for Z440 platform and normal anatomy

Contact us

We're ready to support you in your moments that matter.

We're sorry, a problem occurred with the form. Please try again.
Thank you!

We received your request for assistance.

A GE Healthcare specialist will be reaching out shortly.

Something went wrong

We will check and get back.

JB01125AU May 2023