• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel

Centricity™ RIS‑i

Radiology Information Systems (RIS)

centricity-ris-i-desktop

At a Glance

Efficient Workflow Management

Management of patient data, examination scheduling, and workflow monitoring on a single platform.

Integration of AI Results

Increased productivity and diagnostic accuracy through the integration of AI-generated results within the RadCockpit.

Open Interfaces

With IHE-compliant integration into hospital information systems (HIS, EMR, etc.) and a high degree of configurability, Centricity RIS‑i is a powerful information system for radiology departments.

An information and workflow management system for radiological and nuclear medicine departments, outpatient imaging centers, and hospitals.

Improving the Quality and Efficiency of Medical Care Through Software

Centricity RIS‑i is a scalable, configurable, and modular workflow solution for radiology, developed based on 25 years of experience in Germany.

It supports the entire diagnostic process—from appointment scheduling and reporting to accounting and billing.

By integrating AI for workflow control, rule-based scheduling, and structured reporting, the system enhances both efficiency and quality.

Thanks to its open architecture and standards-based interfaces (IHE, HL7, FHIR), Centricity RIS‑i integrates seamlessly into existing IT environments and imaging modalities.

In addition to patient data management, the system enables flexible, data protection–compliant result distribution across locations—ensuring economic efficiency and future readiness.

Digital Reporting – Flexible and Efficient

Centricity RIS‑i RadCockpit is an integrated desktop productivity solution for clinical reporting in hospital environments. The software provides digital dictation, speech recognition, and medical transcription, and serves as a central interface connecting diagnostics, administration, and patients.

AI Findings within RadCockpit and the SpeechMagic™ Accuracy Trainer further enhance reporting efficiency and diagnostic accuracy, supporting high-quality, consistent clinical documentation.

Centricity™ eRadCockpit

Centricity eRadCockpit is a web-based reporting platform that enables radiologists to perform optimized image interpretation, access relevant clinical information, and obtain second opinions, while supporting standardized report creation.

The platform supports the integration of AI-generated results, contributing to improved diagnostic accuracy and increased productivity. Together, these capabilities significantly enhance the efficiency and quality of medical care.

1-s-curve-centricity-ris-i-desktop

Centricity™ RadCockpit

Centricity RIS‑i RadCockpit is an integrated desktop productivity solution for clinical reporting in hospital environments. The software provides digital dictation, speech recognition, and medical transcription, and serves as a central interface connecting diagnostics, administration, and patients.

AI Findings within RadCockpit and the SpeechMagic™ Accuracy Trainer further enhance reporting efficiency and diagnostic accuracy, supporting high-quality, consistent clinical documentation.

2-s-curve-centricity-ris-i-desktop

Tailored to Your Needs

Centricity™ RIS‑i adapts seamlessly to your processes, systems, and requirements—ensuring maximum efficiency and long-term investment security.

Flexible Workflow Design with High Efficiency

Appointment Scheduling: Integrates into existing systems; fully customizable

Clinical Indication Review: Legally compliant and optimized for workflow efficiency

Registration: Rapid data capture with rule-based support

Service Capture: Structured documentation to ensure appropriate reimbursement

Patient History: Comprehensive overview of all patient data

Reporting: RadCockpit with AI support and speech recognition

Conferences: Automated organization of tumor boards and multidisciplinary meetings

Billing

Hospital Operations: Recorded services can be encrypted and transmitted to the billing system as required

In-System Billing: Supports private billing, multiple insurers, occupational accident insurance (BG), and statutory health insurance—with direct support within and from the system

Service Encryption: In accordance with regional regulatory requirements

Technical Capabilities

Report Distribution: HL7, PDF, and CDA via an IHE platform

Analytics and Statistics: Flexible, customizable, and available at any time

Interfaces: Standards-based connectivity including IHE, HL7, and FHIR

Multi-Tenancy: Data protection–compliant support for large networks

Auditing: Logged system access in line with regulatory requirements

Web Modules: Location-independent access via eRadCockpit and TRUE‑PACS

System Platform: Windows standard

CENTRICITY™ UNIVERSAL VIEWER


CENTRICITY™ UNIVERSAL VIEWER

A next-generation PACS (Picture Archiving and Communication System) designed to provide comprehensive access to medical images across departments and specialties.


ADVANCED VISUALIZATION
AW (Advanced Visualization) simplifies post-processing, enabling you to make optimal use of your most valuable resource: time.


CENTRICITY™ CARDIO ENTERPRISE

An IT solution specifically designed for cardiology, providing cardiologists with a centralized access point to all relevant patient data and images, and enabling their integrated and contextualized review.

See for Yourself What Centricity™ RIS‑i Can Do

Überzeugen Sie sich selbst von
Centricity™ RIS-i

Thank you!

We received your request for assistance.

A GE Healthcare specialist will be reaching out shortly.

Something went wrong

We will check and get back.

JB08397XE June 2025