• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel

Remote Control Suite

Take CT exams with serenity

product-hero-remote-control-suite

In the current context of the pandemic, the protection of frontline healthcare professionals fighting the novel coronavirus has become a priority. To this end, GE Healthcare is now offering the possibility to position patients remotely from the scan control room with Remote Control Suite.
Exposure for health care workers is now limited because of the physical distance from the patient.

Minimized potential contamination risk between gantry and console rooms

Remote Control Suite is designed to position patients remotely from the scan control room, allowing the technologist to remain isolated from the patient. This kit solution is suitable for sites with scanners operated by one or two persons:

 

A single radiographer can manage the entire workflow remotely, from exam start to end.

 

Where there are two radiographers, one remains at the console without entering the gantry room, and the other manages patient setup and assists with post-scan steps.

s-curve-01-remote-control-suite

A system designed to position patients remotely from the scan control room

Remote Control Suite includes a control panel that is located near the CT console. The operator can perform all tasks, from welcoming the patient until the end of the exam, without entering the CT room. With a three-video monitoring system* installed in the gantry room, you can:

  • Adjust the gantry
  • Activate light alignments
  • Position the table
s-curve-02-remote-control-suite

Both of these tools help the patients feel safe and reassured that they will be monitored and not left alone at any time during the process.

s-curve-03-remote-control-suite

FootNote

* Can be sold as separate option.

Contact Us

Thank you!

We received your request for assistance.

A GE Healthcare specialist will be reaching out shortly.

Something went wrong

We will check and get back.

JB16526XX July 2021