• Change country/language

    Looks like you’re in {} — you’re on the {} site.

    Cancel

    Country and language selected

    You are being redirected to the {} site. Products and services availability vary by country. Do you wish to continue?

    Continue
    Cancel

Revolution™ Maxima

Overall, a top performer

Revolution Maxima is a powerful, high-performing and reliable CT designed to maximize every step of the CT workflow, from referral to report.

 

Every day you look for ways to accommodate an increasing load of patient referrals with the same number of department resources. It’s a constant balancing act that places extra emphasis on the overall efficiency of your entire CT workflow.

For you, the final CT image is only part of the story. How you get to that image is just as integral to the quality of your patient care as the images themselves.

This philosophy is at the foundation of our new CT and it’s why we called it Revolution Maxima. We evaluated every angle of the CT workflow and then went to work simplifying, streamlining, automating and applying advanced technologies like AI wherever possible with the goal of transforming the entire CT experience.

What's New!

Watch Maxima debut

Highlights

 

  • AI-based Auto positioning
  • Dose optimization up to 82 %
  • High quality image :1024 Matrix reconstruction

Request for a demo

Revolution™ Maxima Fast Facts

  Hands free, one-click Auto-positioning  

 

 

A.I based technology Pinpoints the center of the scan range and automatically aligns it with the isocenter of the bore with one click for a completely hands-free positioning experience

  Dose optimization  

 

 

Accurate localizer centering powered by A.I based accuracy in positioning helps to achieve an appropriate balance of radiation exposure

  Image quality 1024 matrix  

 

 

The 1024 Matrix is an additional matrix format available for image reconstruction in addition to standard 512 reconstruction matrix.

  Smart applications  

 

A collection of Intelligent applications for cardiac, stroke, oncology and metal artifacts that continues to support high-quality images.

One-click, hands-free automation

Revolution Maxima simplifies the entire patient setup process. Innovative auto centering technology is at the core of our improved scan experience, but it starts with related protocol recommendations. By comparing the exam description against a database of scan protocols, the system displays a short list of protocols to choose from. What used to take valuable time searching for the right protocol and then manually positioning the patient in the bore, can now be done with a quick selection and the simple click of a button.

GEHCRevolutionMaximaProductWebPagePreScanImage2

Dose Optimisation

 

Mis-centering causes magnification and leads to unnecessary radiation dose exposure to patients. Accurate localizer centering is required to achieve an appropriate balance of radiation exposure and image noise. With precise landmarking in scout scan and the ability to accurately detect the isocentre of the patient, Revolution Maxima may help to avoid Unnecessary radiation exposure to patients  to ensure the most appropriate low dose is catered to patients. together with dose reduction software, ASiR-V, the CT provides us with the right tools to get to the right diagnosis at the lowest dose possible.

Clinical Gallery

GE healthcare ct service

Optimize operational performance with digital tools

 

iCenter & MyGEHealthcare App

 

Visible data. Optimized Assets.

iCenter: Asset management application to manage service contracts and inventory, asset maintenance, optimize asset utilization, and support compliance needs

 

OnWatch

 

More Productive. Less Waiting.

OnWatch remotely monitors various CT system parameters and signals potential errors for early diagnosis & troubleshooting to initiate timely corrective action

 

Tube Watch

 

Reduce Disruptions. Enhance Care.

Using digital twin technology, Tube Watch is a predictive solution that remotely monitors & predicts an impending tube failure, before any disruption occurs through proactive part delivery & service scheduling

 

Imaging Insights

 

Improve visibility. Actionable insights. Better outcomes.

Informatics platform for Imaging Department managers providing actionable insights to help increase exam throughput, reduce backlog, and optimize protocols and technologist performance.

 

DoseWatch

 

Improved focus on patient care

Suite of apps providing data, analytics, and clinical insights to better manage dose

 

Imaging Protocol Manager

 

Optimized protocols every time, everywhere.

Cloud-based protocol-management solution that provides access, insight, and governance for imaging device protocols

Contact us

We're ready to support you in your moments that matter.

We're sorry, a problem occurred with the form. Please try again.
Thank you!

We received your request for assistance.

A GE Healthcare specialist will be reaching out shortly.

Something went wrong

We will check and get back.

JB18574XX December 2021