ulrichINJECT CT motion

Less Waste, Fewer Steps, Do more with syringeless

With its automated syringeless technology, the CT motion™ can help support workflow efficiencies with set up and patient turnover.

In 2019, GE Healthcare was pleased to begin cooperating with ulrich medical, to deliver the ulrich CTmotion™ in the United States. With ulrich's focuses on advancements in medical technologies, ulrich medical contrast media injectors have been used for more than 30 years in hospitals and radiology practices around the world.

With its automated syringeless technology, the CT motion™ supports workflow efficiencies such as quick and easy set-up and patient turnover. The injector can help remove the need for manual syringe filling which may minimize examination preparation time and minimize contrast media waste. The ulrichINJECT CT Motion is used in CT procedures for the delivery of Omnipaque™ (Iohexol) Injection* contrast medium as supplied in Imaging Bulk Packaging.

*For full information about prescribing information including Boxed Warning please visit (www.gehealthcare.com/products/contrast-media/omnipaque)

Abbreviations:
CT
, Computed Tomography

ulrichINJECT CT motion Overview
ulrichINJECT CT motion Overview

Experience the features of Syringeless technology

1. Integrated CM heat retainers to maintain CM temperature in container

2. Media container holder for saline (NaCl). Optional: Saline Rod

3. Media detectors with status indicator

4. Display unit to help support efficient operation

5. Pressure sensors

6. Patient tubing air detector

7. Pump tubing-flex air detector with status indicator

8. Terminal includes injection programs. As well as, safety alerts and timers for day set, contrast media, and patient tubing.

Abbreviations:
CM, Contrast Medium

Syringeless ? Innovation made in Germany

Tubing System

The tubing system for the ulrichINJECT CT motion consists of pump tubing-flex, spike for CT and patient tubing.

Pump tubing-flex

24-hour multiple patient use

The CT motion pump tubing-flex is cleared for 24-hour usage or a maximum of 19 contrast media bottles, whichever comes first.

1. Swabable valve Connection point for patient tubing to help support aseptic procedure.

2. Check valve

3. Swabable valves Connection point for spikes to help support a hygienic security barrier for the media input (aseptic Global - technique).

4. Pressure sensor unit with integrated particle filter.

Tubing System

Spike for CT (CM/NaCl)

Single-bottle use
Spikes used with Omnipaque™ contrast media in Imaging Bulk Package (IBP) and with the saline (NaCl) container/bag.

1. Integrated air filter on spike

Patient tubing

250 cm

Single-patient use
The patient tubing connects the pump tubing-flex to the cannula on the patient and transports media from the pump tubing-flex to the patient.

2. Double check valve system

Abbreviations

IBP, Imaging bulk pack
CM, Contrast medium
NaCl, Saline

Spike for CT (CM/NaCl);
Product Descriptions
Product Ordering

*For full information about prescribing information including Box Warning please visit (www.gehealthcare.com/products/contrast-media/omnipaque)

Indications for Use

ulrichINJECT CT motion is a contrast media management system that is indicated for the controlled, automatic administration, on the venous side, of contrast media and saline (NaCl), to human subjects undergoing diagnostic examinations in computed tomography (CT) applications.

ulrichINJECT CT motion is specifically indicated for use in CT procedures for the delivery of Omnipaque™ (Iohexol) Injection, solution - GE Healthcare Inc. contrast media as supplied in Imaging Bulk Packages (IBP).

Pump tubing-flex is used for a maximum time of twenty four (24) hours. When used with Omnipaque™ IBP, a maximum of 19 bottles of contrast media can be used or maximum time of twenty four (24) hours of Pump tubing-flex, or whichever comes first, with a maximum of eight (8) hours per contrast media or saline container.

Spike for CT disposable is for single-bottle use only and must be discarded with the media container. The Patient tubing must be discarded after each patient procedure.

ulrichINJECT CT motion is to be used only by and under quasi-continuous supervision of trained healthcare professionals in an appropriate licensed healthcare facility, in a room designated for radiological procedures that involve intravascular administration of contrast agent.

510 K Number:K171392

June 2020 JB73793US
Ulrich/ulrich and ulrich medical are registered trademarks of ulrich GmbH & Co. KG and/or its affiliates.

Related Products

For full information about prescribing information including Boxed Warning please visit (www.gehealthcare.com/products/contrast-media/omnipaque)

Sorularınız mı var? Görüşlerinizi duymak istiyoruz.

JB73793US