category-hero-imaging360-desktop

Imaging 360

One holistic view of your imaging operations offers actionable insights to optimize your fleet, protocols and staff, along with remote collaboration* to increase efficiency.

Optimize radiology operations and increase productivity

With Imaging 360, streamline your operations across your imaging fleet efficiently and effectively. Move beyond the data with actionable insights to help achieve consistent quality of care and improve efficiency.

s-curve-optimize-radiology-desktop-tablet

Feel empowered with a 360 view that enables you to make data-driven decisions to improve patient care.

With easy step-by-step guidance and the ability to personalize your view, you can quickly access actionable insights through a cloud-based dashboard so you can make data-based decisions anytime.
One holistic view
Designed to address your core imaging operations functions
Imaging 360 is a digital platform to facilitate workflow, ease staff burden and help you achieve your department goals.
Imaging 360 Operations
Actionable insights. Improved visibility.

With a holistic view of your imaging fleet, leverage centralized data analytics to make operational adjustments based on department performance to optimize the day-to-day and inform long-term planning.

  • Study data around disruptions, machine downtime and lost timeslots to proactively improve operations and help avoid lost revenue.
  • Get the insights you need to optimize imaging workflows and schedule patient exams efficiently.
  • Use analytics to see how exams vary by duration and protocol. Analyze the data to help standardize procedures and streamline scheduling.
feature-hero-imaging360-operations-st-en
Imaging 360 Protocols
Optimized productivity. Consistent quality.

Easily manage protocols across multiple locations and devices to help drive enterprise-wide efficiencies and deliver the image consistency needed for optimal patient care.

  • Save time and improve the quality of care when you reduce rescans with protocol consistency across your fleet.
  • Remotely configuring protocols means you can update an entire fleet in minutes instead of having staff travel from site to site to manually update the fleet.**
  • See multi-vendor system data in one place to help manage your protocols across your imaging fleet.
feature-hero-imaging360-protocols-st-en
Imaging 360 Remote*
Connected staff. Remote expertise.

Remote* connectivity enables scaling your resources for training, real-time collaboration and knowledge sharing.

  • Counter radiology resource scarcity and cost pressures across multiple sites by leveraging expert users to offer remote, real-time guidance to less experienced staff
  • Initiate MR scans remotely to maximize existing resources for connectivity.***
  • Keep operations running smoothly when you provide remote scan guidance during MRI and CT procedures*
feature-hero-imaging360-remote-st-en
Get in touch

Have a question? We would love to hear from you.

References

  1. Results listed here are of these specific customers and may not be typical. Results are based on factors specific to each customer. GE HealthCare cannot guarantee these or similar results. Not all products or features are available in all geographies. Check with your local GE HealthCare representative for availability in your country.
  2. Results obtained from https://www.bmj.com/content/379/bmj.o2614. Results may vary.
  3. Results obtained from DASA Brazil, JB31441XX. The DASA site solution configuration includes some features that are not available in the U.S., namely the ability to remotely move the patient table and remotely communicate with the patient. Results may vary.
  4. Results obtained by Miungo, Germany, JB31439XX. Results may vary.

Disclaimers

*Remote scanning, training, and collaboration can be fulfilled by either nCommand™ Lite by IONIC Health or Digital Expert Access with Remote Scanning for MR by GE HealthCare. Consult your sales representative for availability in your region.

**Specific remote features and protocol management capabilities vary based on the GE HealthCare hardware and software level of the compatible device.

***MR remote scan initiation is not available on all GE HealthCare MR models or in all regions.
Contact us

We're ready to support you in your moments that matter.

We're sorry, a problem occurred with the form. Please try again.
Thank you for registering

Please check your inbox to confirm your registration. We will send you 
a link to the event 24 hours before the event is due to begin.

Something went wrong

We will check and get back.