|


Active System Management
GE Healthcare - Information Technologies
|
|
Active System Management DEMO
|
The ROC monitors over 175+ systems worldwide
-
Global operations, co-located with GE Medical Systems Modality On-line Center and Engineering teams
-
Built on more than 15 years of GEMS On-line Support and InSite Technology.
-
Industry certified, dedicated PACS, RIS, SSP, Network, and CV IT Support engineers
-
Delivering Proactive Remote Support over secure private connections
-
Database of service problems and resolutions, provides historical system information and faster problem resolution.
|
|
Traditional Support Process
-
Service call initiated by the customer
-
GE's Remote Operations Center performs remote diagnoses to resolve customer identified issues
|
|
 |
|
Proactive Support
- GE's Remote Operations Center logs on to the system through a persistent
link
- ROC engineer performs a daily system health check
- ROC engineer performs corrective action
|
|

|
|
|
 |
|
ACTIVE Support
- Software Agents on your system monitor PACS/RIS Operations
- When a pre-established limit of a parameter is met, an alert is generated
and immediately sent to the ROC
- ROC engineer performs corrective action
|
|


|
|
|
|
ACTIVE System Management and Lake County Hospital
Connected ….Lake County Hospital and GE's ROC
-
Permanent secure connection between Hospital and GE's ROC.
-
Connectivity options include VPN & Frame Relay
-
ASM Software agents reside on the IMS, LT Archive, HIS/RIS interface and Web Server
-
Software agents monitor over 100 key logs, processes and thresholds
-
Because agents reside on the system, they are active and will automatically check performance around the clock
|
|
ASM is continuously monitoring the "Transaction Log Free Space" and as the threshold exceeds a pre-established limit, an alert is generated and automatically sent to the ROC.
|
About Transaction Log Free Space
TLFS logs all database transactions and if it fills beyond the threshold limit, retrieving or sending exams will become a problem and could ultimately shut down the system.
|
|
-
Through a secure and dedicated persistent link connection, the alert is sent instantly to the ROC team.
-
A ROC engineer analyzes the transaction log free space alert message.
|
|
-
The ROC Engineer has the ability to truncate the transaction log free space setting the system back to normal operation.
-
The ROC's ability to proactively fix this problem minimizes any interruptions to the systems performance allowing users to benefit from an optimal level of performance.
-
50% of system issues resolved prior to customer impact and most issues have the ability to be fixed without an FE on site.
|
|
Depth and experience of our people and technology ensure top performance
-
Proactive and Active Vs. Reactive fixes problems before they become critical
-
Increased System Productivity
|
|
|